I've completed one of the buildings for the brewery complex. This one is the main production and shipping building, popularly known as the Walthers Superior Paper Mill. I thought it made a very good mid-size regional brewery building. It came with some storage tanks, but I'll complement those with the Walthers Plastic Pellet loading facility. I still have to get an office/brewhouse building, which I think is going to be the Walthers Engineering Office. I had to at least get this building built so I can finish the rest of the trackwork.
The kit strangely came with some extra pieces, which I deduced are one of the side walls and the smoke stacks for the Walthers boiler house for the paper mill complex. I may be able to use that as a backdrop building amidst the steel mill complex.


No comments:
Post a Comment