Sunday, October 29, 2017

Brewery complex

I've completed one of the buildings for the brewery complex.  This one is the main production and shipping building, popularly known as the Walthers Superior Paper Mill.  I thought it made a very good mid-size regional brewery building.  It came with some storage tanks, but I'll complement those with the Walthers Plastic Pellet loading facility.  I still have to get an office/brewhouse building, which I think is going to be the Walthers Engineering Office.  I had to at least get this building built so I can finish the rest of the trackwork.

The kit strangely came with some extra pieces, which I deduced are one of the side walls and the smoke stacks for the Walthers boiler house for the paper mill complex.  I may be able to use that as a backdrop building amidst the steel mill complex.