I realized I haven't updated this in quite some time. I've made some significant progress on the river channel end of the layout.
Background - I printed out a couple appropriate buildings for the background, plus a Corps of Engineers derrickboat for the channel. I'm not sure if I printed these in the right proportion, but they look okay so far. I couldn't really get them any bigger.
I still need to put scenery around there. Piles of sand, some bushes and weeds, and a front end loader. It fits the need for a focal point for that space, in transition from the steel mills to the river.
I hate using any of those piping things. I built them semi-connected, because I knew they wouldn't stay that way. The buildings are semi-secured like the houses were around 4 nails inside. The silos don't stay that way very well. I learned you can't really glue PVC pipe to anything, but that styrene sorta stays on. I at least glued the surge bin and conveyor to a piece of styrene so they would stay together. I guarantee at some point this will come un-done.
Up next:
1. Scenery around the sand distributor.
2. I bought a pack of SuperTrees - I'll have to try to make some.
3. Start scenery around the brewery.